Project Description

PROJECT DETAILS

CLIENT: PE Roads of Serbia

DATE: 2017 – 2020


CONTRACTOR: China Shandong International
Economic and Technical Cooperation Group Ltd. of Shandong Hi-speed Group Co Ltd.

NING LTD. CONTRACTOR: China Shandong International Economic and Technical Cooperation Group Ltd. of Shandong Hi speed Group Co Ltd.

SERVICE PROVIDED BY NING LTD:

As Built Design Site Support

The E-763 highway is a branch of the Trans European Highway that connects its main route, from Gdansk to Athens and Istanbul,  with the Adriatic Sea and the Port of Barin the territory of Montenegro.

The E-763 Belgrade-Southern Adriatic highway route provides the shortest connection to western Serbia, Montenegro, and via the Port of Bar to southern Italy. Total length of this highway is approximately 258 km, divided into smaller sections for construction purposes.

Section 3 from Obrenovac to Ub (from km 14+416.19 to km 40+645.28) is 26.23 km long and is conducted through flat terrain in the Kolubara river valley with alignment parameters for design speed of 120km/h.

The Highway includes two lanes, one emergency lane on both sides and median, with total width of 25.4 m. Section includes 14 Bridges, 14 deviations of local and regional  roads, one interchange (Ub), one resting area, 17 river bed regulations.

NING Ltd. provided site support during construction phase with the final quantities calculation for the main alignment, deviations  of local roads, river bed regulations and culverts.

After completion of works NING Ltd. was entrusted to provide As Built Design for the entire section 3.

The scope of the works included design for the main alignment, power supply, lighting and telecommunication works, signalization, drainage, river bed regulations, landscaping, deviations of local roads, structures, (bridges, overpasses, box and pipe culvert, noise barriers) and interchange.

All As Built Design documentation was executed at the level of the Main Design.