Project Description
PROJECT DETAILS
CLIENT: Serbian Railways BENEFICIARY: Ministry of Transport on behalf of Serbian Railways
DATE: 2015-2016
CONTRACTOR: Italiana Costruzioni Spa Ogranak Beograd, Consorzio Armatori, Ferroviari S.C.P.A.
NING LTD. CONTRACTOR: Italiana Costruzioni Spa
SERVICE PROVIDED BY BY NING LTD.:
As Built Design
The reconstruction and modernization of this section includes the construction of new double-track, electrified railway from new Gilje halt to the entrance to the Paraćin station.
The reconstruction and modernization improved the railway facilities in this line section Beograd-Niš, both technologically and by reducing the overall maintenance costs. The new railway line is designed for train speeds up to 160 km/h.

The total length of this new section of double-track railway line on the line Gilje – Ćuprija – Paraćin is 10.18 km and the single-track line stretching on the line Ćuprija – Paraćin is 6.8 km.
NING Ltd. is Italiana Costruzioni Spa contractor, for the As Built Design works which include designs for alignment, deviations of local roads, structures, riverbank slope protection.