Project Description
PROJECT DETAILS
CLIENTS: Power Construction Corporation of China Limited Ogranak Beograd; NIS a.d., Infrastructure of Serbian Railways; Electric owner Industry of Serbia FIAT Automobili Srbija; Others
DATE: 2011-2019
SERVICES:
Conceptual Solutions
Preliminary Design
Main Design
As Built Design
Constriction
Reconstruction included several City streets in Belgrade. The Slavija Square roundabout, is a place where seven streets meet. This roundabout is one of the city’s busiest traffic junctions and together with Boulevard Oslobodjenja, that is also part of reconstruction, connects a large part of the city center with the city motorway. All together this junction point makes one of the most burdened traffic areas.
DESIGN PHASE
From Conceptual Solutions up to Main Design and obtaining construction permits providing full design service (road alignment, drainage systems, structural, signalization and safety signaling systems, etc.)

CONSTRUCTION PHASE
Providing official applications for any necessary road closures, setting up the road closures with diversion signs and traffic operation during construction, surveying services for route surveying, carrying out surfacing works, removal and installation of asphalt coatings, Strail coatings, etc., installation of any road safety equipment and infrastructure.
Some of our level corssings designs/constructions projects are:
ON RAILWAY LINE RAKOVICA-RESNIK ON STATION KM 12+438.
ON INDUSTRIAL RAILWAY TRACK, KM 0+884, FOR WAREHOUSE OF PP AND LPG IN THE CITY OF NIŠ
ON RAILWAY TRACK IN FIAT CHRYSLER AUTOMOBILES SERBIA FACTORY
ON RAILWAY LINE RUMA-ŠABAC ON STATION KM 66+207